When is it time to act and choose solutions

When considering health and safety practices, as well as business efficiency, ask yourself: are the foundations under your warehouse, the floors inside, the loading and unloading area, the transport hub, or the access road stable? Many structural problems are caused by decompressed soil. Sagging floors in buildings or cracks that appear on traffic areas, sidewalks, or driveways can be signs of unstable soil, often caused by subsidence. This can cause design problems, which in turn affects the comfort and safety of both people and the business as a whole.

There are Premium Technologies solutions that allow you to quickly, unobtrusively and economically fix major problems with minimal interference in your daily work. Premium Technologies is a two-in-one solution that provides improved ground conditions and leveling of sagging structures, while simultaneously increasing the load-bearing capacity of the ground and filling the void.

What does the problem with the foundation look like?

Pay attention to:

1. sagging floors. They pose a risk to the movement of workers, their access to machines and equipment for work processes, maintenance, repairs or cleaning.

2. cracked floors, sagging concrete slabs, sloping shelves. It also affects the safety of workers and the efficient operation of trucks (reach trucks and loaders) and equipment. And this is likely to be a sign that the ground of the floor base needs to be reinforced to support the weight of heavy equipment and loads.

It is also important to know that delaying the repair of floor slabs disturbed by sediment can increase structural damage and the risk of failure. Subsidence of exterior slabs and walkways usually causes organized runoff to be disrupted, and then water seeps into the foundation soil, and this leads to even more damage and increased subsidence.

If you have reached this block, then you care about the future of your property. By applying for help from qualified specialists in time, you will significantly save your time and financial costs.

The first step to save an object that is subject to destruction is to examine the building by specialists. This will help you avoid making rash or ill-considered decisions about measures aimed at stopping this process.

Premium Technologies specialists will go to the site and determine the type of foundation deformation and find out its causes. Depending on the data obtained, they will perform the necessary calculations, determine which measures will help to stop the destruction of the building, and which method of strengthening the foundation will be optimal.

Based on this information, you will be able to make an informed decision in which of the three directions to go: 
Subsidence and deformation mayoccur due to the following reasons::
Questions answered by Premium Technologies:
What we guarantee
1

Almost instant results

2
Selecting and determining the appropriate solution together with the client
3

Only top-end equipment and tools

4
Possibility of phased implementation of the project in accordance with the client’s schedule
5

Post-project monitoring and responsiveness when improvements are needed. Communication 24/7 

6

Parallel improvement of hydro -, heat-and vibration insulation characteristics of structures

In any situation, it is important to consciously assess the risks of a decision or omission with a construction expert
25%
Savings compared to traditional technologies
2-3 days
Executing a standard project
5 years old
Minimum guarantee for completed work
18 seconds
Curing time of the material
0.5 mm
Accuracy of work performed
Our projects
Answers to frequently Asked questions

Performing work using Premium Technologies technology does not require moving out residents or stopping the operation of the house. 

The materials we use are durable and resistant to aggressive environments. Premium Technologies has the ability to guarantee works for up to 60 years. 

We use Premium Technologies geopolymer resin injection technology, which is similar to a "microsurgical operation" without excavation and excavation or clutter management.

Cracks in the walls are closed as the building structure rises. Windows and doors will work normally again if there were misalignments before. 

Most projects are completed within two to three days. Keep in mind that each project is different.
Most projects are completed within two to three days. Keep in mind that each project is different.

The injected material is environmentally inert and does not have a harmful effect on the environment.