The work was completed without stopping the building's operation
Focus: ground stabilization of the floor slab base, lifting of the floor slab
Location: Astana, Qazaqstan
Technology: Deep Stabilization & Slab Lifting
Year: 2015
Reason for the request: sagging of the floor of a separate room on the first floor.
Problem: uneven subsidence of the floor slab in the residential area (up to 27 mm), at the base of the floor slab, the soil is heterogeneous, loose from a depth of 0.9 m from the floor.
Goal: ground stabilization of the floor slab base, lifting of the floor slab.
Completed works:
compaction of the ground directly under the slab and at a depth of;
lifting the floor slab to the design mark.
Methods used: Deep Stabilization, Slab Lifting.
Scope of work: Work area 37.8 m2 floor slabs.