  • Reason for treatment:
    • cracks on the blind area surface;
    • subsidence of the blind area;
    • zamokanie basement walls.
  • Problem: as a result of the survey of the ground by dynamic sensing, voids up to 10 cm were found under the blind area, and the foundation backfill soil was loose.
  • Goal: stabilization of the ground at the base of the blind area around the perimeter of the house with a basement.
  • Completed works:
    • filling of cavities under the blind area and along the basement walls;
    • compaction of backfill soil to the basement floor level;
    • stabilization of light pits;
    • leveling of the blind area.
  • Methods used: Deep Stabilization, Slab Lifting.
  • Scope of work: 80.2 m2 of blind area slabs.