  • Reason for the request: sagging columns of the building frame, cracks in walls and partitions.
  • Problem: non-uniform bulk soil at the base of foundations. Subsidence of tape foundations of the frame.
  • Goal: soil stabilization at the base of foundations.
  • Completed works: stabilization of the ground at the base of the belt foundations of the frame.
  • Methods used:Deep Stabilization.
  • Scope of work: 36.5 square meters of strip foundations.