Premium Technologys

Lifting and leveling of road surfaces for various purposes

Using geopolymer resins for injection is a quick and effective way to fix problems that affect the stability of major roads, bridges, tunnels, and public transport networks. Geopolymers can be used to strengthen the soil under the road surface, as well as to raise and level sagging elements.

Premium Technologies often implements projects to restore a wide range of infrastructure facilities. The technologies that our company uses allow us to extend the service life of infrastructure facilities without disrupting the daily operation of the transport network or affecting its users.

Maintenance of roads, highways, bridges and transport interchanges

Long-term operation of the roadbed can lead to its destruction. Various factors, such as heavy traffic congestion, environmental impact, and others, can lead to ground subsidence and bumps on the road, which in turn leads to accidents and a decrease in the load capacity of the road. This problem most often occurs in areas with high traffic intensity, parking lots and maneuvering areas for trucks, at crosswalks between the roadway entrance and the bridge, as well as on cargo platforms.

Premium Technologies geopolymer injection technologies allow you to raise and eliminate subsidence. This is achieved by injecting resin into the base of the road, which fills all the available space, which allows you to quickly and effectively strengthen the soil and level the roadbed. The solution is cost-effective and fast to use, with minimal inconvenience in the movement of traffic.

What does the problem with the foundation look like?

Problems with the foundation of the roadway can occur for various reasons, including the following:

  • insufficient compaction of the ground;
  • incorrect design of the roadway;
  • poor quality of construction materials;
  • insufficient maintenance and other factors.

Any of these factors can lead to a deterioration in the quality of the roadway, shortening its service life and reducing the capacity of freight transport.

Efficient and timely upgrades and maintenance are critical to ensuring the durability of the transport infrastructure. Premium Technologies technology allows you to avoid unnecessary budget expenses and reduce inconveniences and interruptions in the operation of public vehicles.

Geopolymermapping method for lifting and leveling road surfaces

A geopolymer input method called Slab Lifting will help you restore the position of the roadway. It allows you to raise and level sagging sections, which simplifies the repair of emergency sections of roads, sections located near bridges, railways, port docks, loading platforms and other objects.

Using the Slab Lifting method is more effective than traditional road repair methods. Advantages of this method:

  • geopolymer resins are better able to withstand intense dynamic loads;
  • restoration of a road or parking area using geopolymer resins takes from several hours to several days;
  • the work can be carried out in stages, without blocking all traffic areas, and at a convenient time when traffic is minimal.

 

Vehicle traffic can be restored on the site repaired with geopolymers within 15 minutes after the work is completed. Compared to the time required to restore a road section with dismantling and restoration of the roadbed, which can take weeks or months, using the Slab Lifting method is a faster and more convenient solution.

Geopolymer injection technologies allow not only to restore the level of the roadway, but also to strengthen the ground under the roadway, or to strengthen the base when laying new highways and autobahns. When injecting geopolymers into the thickness of excessively moistened soil, excess moisture is displaced, which increases the roadbed’s support capacity. For this purpose, the method of Deep Stabilization technology is usually used.

If you have reached this block, then you care about the future of your property. By applying for help from qualified specialists in time, you will significantly save your time and financial costs.

The first step to save an object that is subject to destruction is to examine the building by specialists. This will help you avoid making rash or ill-considered decisions about measures aimed at stopping this process.

Premium Technologies specialists will go to the site and determine the type of foundation deformation and find out its causes. Depending on the data obtained, they will perform the necessary calculations, determine which measures will help to stop the destruction of the building, and which method of strengthening the foundation will be optimal.

Based on this information, you will be able to make an informed decision in which of the three directions to go: 
Subsidenceof transport infrastructure items can be caused by the following factors::
Questions answered by Premium Technologies:
What we guarantee
1

Almost instant results

2
Selecting and determining the appropriate solution together with the client
3

Only top-end equipment and tools

4
Possibility of phased implementation of the project in accordance with the client’s schedule
5

Post-project monitoring and responsiveness when improvements are needed. Communication 24/7 

6

Parallel improvement of hydro -, heat-and vibration insulation characteristics of structures

In any situation, it is important to consciously assess the risks of a decision or omission with a construction expert
25%
Savings compared to traditional technologies
2-3 days
Executing a standard project
5 years old
Minimum guarantee for completed work
18 seconds
Curing time of the material
0.5 mm
Accuracy of work performed
Our projects
Answers to frequently Asked questions

Performing work using Premium Technologies technology does not require moving out residents or stopping the operation of the house. 

The materials we use are durable and resistant to aggressive environments. Premium Technologies has the ability to guarantee works for up to 60 years. 

We use Premium Technologies geopolymer resin injection technology, which is similar to a "microsurgical operation" without excavation and excavation or clutter management.

Cracks in the walls are closed as the building structure rises. Windows and doors will work normally again if there were misalignments before. 

Most projects are completed within two to three days. Keep in mind that each project is different.
Most projects are completed within two to three days. Keep in mind that each project is different.

The injected material is environmentally inert and does not have a harmful effect on the environment.