Premium Technologys

Increasing the load-bearing capacity of soils and filling cavities
Ideal for weak areas

Premium Technologies is an international company that uses non-invasive cutting-edge technologies to reinforce, re-align, maintain and reinforce unstable or dirt structures on or in the ground. Items can be residential buildings, buildings, structures, or parts of them: concrete slabs, outbuildings, sidewalks, and driveways.

Premium Technologies is at the forefront of developing unique and innovative solutions to address foundation problems in residential, industrial, commercial, civil and mining assets. It is one of the world’s leaders in providing precise ground and underground engineering systems for injecting polymer materials and other technologically advanced solutions that provide alternative solutions to traditional methods. The methods we use are environmentally friendly, cost-effective, and non-invasive, which ultimately stops destruction and saves time.

What does the problem with the foundation look like?

For more than 10 years, Premium Technologies has improved its unique process for strengthening foundation soils and leveling structures. Using this flagship method, we inject geopolymer resins into the base of the sagging structure of the object, filling any voids that the resins encounter as a result of expansion to maximize the maintenance of the ground part of the structure. Then, after stabilization, if necessary, we lift the structure from a deeper level of injection, using a controlled force generated by the expansion of the resin.

If you have reached this block, then you care about the future of your property. By applying for help from qualified specialists in time, you will significantly save your time and financial costs.

The first step to save an object that is subject to destruction is to examine the building by specialists. This will help you avoid making rash or ill-considered decisions about measures aimed at stopping this process.

Premium Technologies specialists will go to the site and determine the type of foundation deformation and find out its causes. Depending on the data obtained, they will perform the necessary calculations, determine which measures will help to stop the destruction of the building, and which method of strengthening the foundation will be optimal.

Based on this information, you will be able to make an informed decision in which of the three directions to go: 
Loosening of the soil and loss of bearing capacity of the base can be caused by the following factors::
Questions answered by Premium Technologies:
What we guarantee
1

Almost instant results

2
Selecting and determining the appropriate solution together with the client
3

Only top-end equipment and tools

4
Possibility of phased implementation of the project in accordance with the client’s schedule
5

Post-project monitoring and responsiveness when improvements are needed. Communication 24/7 

6

Parallel improvement of hydro -, heat-and vibration insulation characteristics of structures

In any situation, it is important to consciously assess the risks of a decision or omission with a construction expert
25%
Savings compared to traditional technologies
2-3 days
Executing a standard project
5 years old
Minimum guarantee for completed work
18 seconds
Curing time of the material
0.5 mm
Accuracy of work performed
Our projects
Answers to frequently Asked questions

Performing work using Premium Technologies technology does not require moving out residents or stopping the operation of the house. 

The materials we use are durable and resistant to aggressive environments. Premium Technologies has the ability to guarantee works for up to 60 years. 

We use Premium Technologies geopolymer resin injection technology, which is similar to a "microsurgical operation" without excavation and excavation or clutter management.

Cracks in the walls are closed as the building structure rises. Windows and doors will work normally again if there were misalignments before. 

Most projects are completed within two to three days. Keep in mind that each project is different.
Most projects are completed within two to three days. Keep in mind that each project is different.

The injected material is environmentally inert and does not have a harmful effect on the environment.