Focus: stabilization of the ground at the base of foundations
Technology: Deep Stabilization
Year: 2016
Reason for the request: sagging columns of the building frame, cracks in walls and partitions.
Problem: non-uniform bulk soil at the base of foundations. Subsidence of tape foundations of the frame.
Goal: soil stabilization at the base of foundations.
Completed works: stabilization of the ground at the base of the belt foundations of the frame.
Methods used:Deep Stabilization.
Scope of work: 36.5 square meters of strip foundations.