Premium Technologys

Car center building
  • Reason for the request:
    • numerous cracks in the walls and partitions;
    • sagging of the floor slab of the first floor in some rooms.

    Within a short time, the cracks were enlarged and new ones appeared.

  • Problem:

    voids under the floor slab. Subsidence of column and belt foundations. The reasons for precipitation were:

    • ground water;
    • leaks from water intake pits;
    • non-uniform bulk soil containing construction debris at the base of foundations.
  • Goal:
    • ground stabilization based on foundations;
    • filling cavities and stabilizing the ground of the floor slab base.
  • Completed works:
    • stabilization of the ground at the base of columnar foundations, foundation beams and belt foundations;
    • lifting self-retaining brick walls to close cracks;
    • filling cavities under the floor slab;
    • soil stabilization at the base of the floor slab.
  • Methods used: Deep Stabilization, Slab Lifting.
  • Scope of work: The work was carried out in a part of the building with an area of 330 m2.
ORDER PROJECT SELECTION AND CONSULTATION
If you can't findan object or situation similar to yours in your portfolio on the website,
then order a selection of a project that meets your requirements
with a detailed description or with the advice of a geotechnical engineer.