Production shop of a food factory
  • Reason for the request:at the existing production facility, the reconstruction project provided for the superstructure of additional floors. A survey of the building’s structures and foundation soils revealed some difficulties in implementing the project.
  • Problem: insufficient bearing capacity of soils at the base of foundations.
  • Goal: soil stabilization at the base of industrial building foundations.
  • Completed works: a reinforced system was formed, which increased the strength and deformation characteristics of weak soil.
  • Applicable methods: Deep Stabilizatio
  • all works lasted 3 working days.