  • Reason for the request: sagging of the floor of a separate room on the first floor.
  • Problem: uneven subsidence of the floor slab in the residential area (up to 27 mm), at the base of the floor slab, the soil is heterogeneous, loose from a depth of 0.9 m from the floor.
  • Goal: ground stabilization of the floor slab base, lifting of the floor slab.
  • Completed works:
    • compaction of the ground directly under the slab and at a depth of;
    • lifting the floor slab to the design mark.
  • Methods used: Deep Stabilization, Slab Lifting.
  • Scope of work: Work area 37.8 m2 floor slabs.